Project and account
Project and account
Project record
Important testing activity, project changes, decisions and handovers, in time order.
Loading the latest successful update…
Project activity
A connection is required to change project notes.
Project record
Since the previous evidence
Evidence quality
Detailed evidence
Outstanding work
Everything waiting on somebody, gathered from device tests, emergency results, issues, history and offline work.
Daily handover
Project delivery
Prepare coordinated Delmatic completion documents from current authorised data.
Device testing
Local control testing
Tap a result or swipe horizontally. You have five seconds to Undo before synchronization starts. Use More for an optional reason or to reassign that device.
Swipe a device right to record a Pass, left for Pending — or tap the buttons. Every entry is kept with who tested and when, and results recorded with no signal queue on the phone and sync automatically. Use More to reassign a device when it is wired to a different module than the drawing says.
Engineering evidence
Drawing and databasing findings for an engineer to review. A finding is evidence, not a fault report.
What was checked
0 findings
Project data
Bring the head-end database into the Tracker. A paired workstation can apply successful previews. Anything ambiguous stops for an engineer.
Manual import
Importing into the selected project. To import into another project, change project at the top of the page first.
Ready to apply
Preview compares the collected database with the current Tracker. Creates are new records, Changes have different stored values, Archives disappeared from a complete capture, and Unchanged are exact matches. Live network health is shown separately below.
Restore automation
Pair an engineer PC once and it can send Snapshots to every current or future Tracker project. The server matches each Lightscape database to its Tracker project. Engineers can change whether the workstation waits for review or applies successful Previews automatically. A Snapshot that cannot be matched unambiguously always stops for an Engineer.
Project structure
Work packages are the Contractor-facing divisions of this project. Database sources are technical and can be moved between packages without losing commissioning history.
Import audit
Engineering evidence
Health observations never alter commissioning progress. “Unknown” means the collector could not check the item.
Workspace settings
People, the companies they belong to, and what each project shows.
People
Access level is the only thing that grants anything. Company and Job role describe the person. Edit a person to put them on a project.
Companies
| Company | People | Actions |
|---|
A company groups people. It grants nothing: what somebody can see comes from their access level and the projects they are on.
Job roles
Create a job role once and use it on every project. A job role describes somebody and routes work to them; access level is what grants anything.
| Job role | State | People | Actions |
|---|
Administration
Project details
| Person | Job role | Access level | Account | Actions |
|---|
Company, Job role, Access level, and account state belong to the Person record. Removing a person here affects this project only.
Project summary
Latest update
Momentum
| Date and time | Overall progress | Modules complete |
|---|
Prioritized work
Commissioning progress
Progress by floor
Modules
Emergency lighting
Areas
Pre-commissioning checks
Snags
Commissioning progress
Detailed commissioning progress for each floor, broken down by addressing and control type.
Progress by floor
| Floor | Overall | Driver addressing | Presence | Photocells | Switches | Scene sets |
|---|
Commissioning progress
Every module in this project and how far each one has progressed.
Progress by module
Project reference
When the lights come on and go off, as read from Lightscape.
From Lightscape
| Schedule | Trigger | ON | OFF | Summary |
|---|
Project reference
The products installed on this project and the codes to order them by. Engineers keep this list.
Supplied by Delmatic
Engineers can maintain this list for the contractor. Changes save to the selected project immediately.
No products listed yet for this project.
Commissioning progress
Every room and area, where it sits on the drawing, and its commissioning status.
Experimental · Delmatic only
| Area | Floor | State | Build | Luminaires addressed | Controls tested | Emergency functional passed | Open snags |
|---|
No witness visits yet. Plan one when areas are ready to witness.
Site work
Each module, whether its installation has been checked with the module’s test button, and whether it is ready for commissioning.
Grouping by floor is experimental. A typed floor is a label only. Once Lightscape has placed a module on a floor, Lightscape’s floor is used.
Project reference
Installation guides, datasheets and other documents for this project. Open a PDF here, or download any file.
Documents for module type
Emergency lighting
Functional and duration results for every emergency fitting, with the outstanding failures grouped by cause.
Emergency lighting
Outstanding failures by cause
Emergency lighting
Open a sensor to see how to fix it and to mark it fixed.
By floor
Actionable Emergency sensors
Snag management
Project reference
View the floor drawings available for this project.
Open a floor to inspect it
Open a floor to inspect it
Delmatic only
Each luminaire in its module's colour, with the module names. Neighbouring modules never share a colour. The DXF has one layer per module, in the drawing's own coordinates, for updating the DALI zone drawings.
Open a floor to see its snags
Project evidence
Build a report from the live authorised data, then print it or save it as a PDF. The report and the workspace use the same data.
Delmatic internal